Gateway to the Zermatt valley and the Matterhorn, Visp sits at the junction of the Rhone and Vispa rivers in the Canton du Valais with about 7,900 residents. Lonza, the pharmaceutical and biotech manufacturer, operates a major production site here. The Matterhorn-Gotthard-Bahn narrow-gauge railway departs from Visp station toward Zermatt, carrying over two million passengers annually along one of the world's most scenic routes. The Loetschberg Base Tunnel (34.6 km), opened in 2007, connects Visp directly to Bern.
The Altstadt preserves the Burgkirche, a medieval fortified church. The Visperterminen vineyard, the highest in Europe under continuous cultivation at up to 1,150 metres, produces Heida (Paien) wine from the surrounding slopes. Hotels in Visp accommodate companion meetings. Escortservice.com publishes reviewed profiles for the Canton du Valais. We do not arrange, mediate, or provide services.
The Vispbach torrent, historically prone to destructive flooding, was channelled in a major engineering project completed in 2016. You must be at least 18.
Gateway to the Zermatt valley and the Matterhorn, Visp sits at the junction of the Rhone and Vispa rivers in the Canton du Valais with about 7,900 residents. Lonza, the pharmaceutical and biotech manufacturer, operates a major production site here. The Matterhorn-Gotthard-Bahn narrow-gauge railway departs from Visp station toward Zermatt, carrying over two million passengers annually along one of the world's most scenic routes. The Loetschberg Base Tunnel (34.6 km), opened in 2007, connects Visp directly to Bern.
The Altstadt preserves the Burgkirche, a medieval fortified church. The Visperterminen vineyard, the highest in Europe under continuous cultivation at up to 1,150 metres, produces Heida (Paien) wine from the surrounding slopes. Hotels in Visp accommodate companion meetings. Escortservice.com publishes reviewed profiles for the Canton du Valais. We do not arrange, mediate, or provide services.
The Vispbach torrent, historically prone to destructive flooding, was channelled in a major engineering project completed in 2016. You must be at least 18.
Country selected
Region selected
City selected